Runway 19L/01R at Las Vegas McCarran International Airport (KLAS) is closed until September 5 for construction. The closure is expected to create bottlenecks in the flow of air traffic both to and from the airport. Operators should plan for possible 30- to 45-minute departure delays during peak demand periods, as well as miles-in-trail restrictions.