Bell Helicopter Unveils Next-Generation Tiltrotor

AIN Defense Perspective » April 12, 2013
The Bell V-280 is aimed at the U.S. Army’s joint multi-role (JMR) requirement for a vertical-lift machine to replace many different military helicopters. (Image: Bell Helicopter)
April 12, 2013, 11:40 AM

Bell Helicopter unveiled its next-generation tiltrotor on April 10 at the Army Aviation Association of America (Quad A) annual convention in Fort Worth, Texas. Bell intends to enter the V-280 Valor in the U.S. Army’scompetition for a joint multi-role (JMR) helicopterand is committed to building and flying a prototype by or before 2017, said Chris Gehler, Bell’s business development manager for future vertical-lift programs.

The V-280 is designed to carry 11 fully outfitted troops, fly up to 800 nm at a maximum speed of 280 knots and satisfy the Army’s requirement for aircraft operations at up to 6,000 feet at 95 degrees F. Estimated mtow of the V-280 is approximately 30,000 pounds and the aircraft will be configured for utility and attack missions and feature composite construction. Unlike the Bell-Boeing V-22 Osprey currently in service with the Marines and the Air Force, the V-280 features six-foot-wide sliding side doors and a V tail. It does not have an aft ramp door as on the V-22 and will feature an engine different from the Rolls-Royce AE1107Cs on that aircraft.

Another difference is that the engines on the V-280 will not tilt as they do on the V-22. Rather, the gearbox enables the prop-rotor to rotate. “Separating the engine and gearbox out of the same nacelle reduces complexity and increases maintainability. We developed a new transmission piece and a 90-degree gearbox that enables those engines to remain in a fixed position. Just the pylon with the prop-rotor rotates and that eliminates the ground heating and exhaust thrust of the V-22,” Gehler said. While the design eliminates the 1,700 pounds of thrust attributable to engine exhaust on the V-22, that will not adversely affect the V-280’s performance, he said. Gehler noted that the V-280 shares much of the advanced systems architecture, including fly-by-wire, of theBell 525 Relentless super-medium twin commercial helicopterannounced last year.

Bell plans to fund design of the V-280 and construction of a prototype with its suppliers and a yet-to-be named major partner. The JMR program is designed to field a common replacement for helicopters that are currently the backbone of U.S. military aviation, including the AH-1Z Cobra and AH-64D Apache gunships, CH-47F Chinook, OH-58D Kiowa, UH-60M Black Hawk and UH-1Y Huey. Production of the winning design could begin in 2025.

The competition includes several phases, and entries for phase one closed in March. The Army is looking for a design that “greatly surpasses” the performance and reliability of current helicopters. The potential spoils from JMR are huge: in 2011 the U.S. Congressional Budget Office estimated the cost of the program at $57 billion. In addition to Bell, other competitors include AVX Aircraft and a Boeing-Sikorsky partnership.

 

FILED UNDER: 
Share this...

Please Register

In order to leave comments you will now need to be a registered user. This change in policy is to protect our site from an increased number of spam comments. Additionally, in the near future you will be able to better manage your AIN subscriptions via this registration system. If you already have an account, click here to log in. Otherwise, click here to register.

 
X